Eden Bourton Manual De Instalación, Funcionamiento Y Servicio página 3

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
Bourton
 
Base 
The integral base must be 100% level and square, the latter can be done by 
checking the 2 diagonals are equal. If it is not square the glazing will not fit.  
 
 
 
 
 
 
Construction 
 
COMPONENTS LIST  
 
SECTION 0 FOUNDATION 
 
SECTION 1 REAR GABLE 
 
SECTION 2 FRONT GABLE  
 
SECTION 3 SIDES  
 
SECTION 4 ASSEMBLE   
 
SECTION 5 ROOF  
 
SECTION 6 WINDOWS  
 
SECTION 7 DOOR  
 
SECTION 8 LOCATING  
 
SECTION 9 GLAZING  
 
SECTION 10 FINISHING  
 
For each section, lay the profiles out on the ground in the same way as pictured in 
the main diagram. Assemble in the order of the pictures. 
M6 x 10 bolts/nuts (parts 50 and 51) are not listed on individual parts lists as they 
are used in each section. 
The following symbols show whether an illustration is viewed from inside or 
outside the greenhouse: 
 
Viewed from the inside   
      
 (White background) 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
GB ‐ Introduction 
Introduction 
 
Viewed from the outside 
 
    (Black background) 
 
 
 
 
 
1
 
 
Eden Greenhouses Customer Helpline +44 (0)1242 676625 
Take note of where you will need to slide extra bolts into the channels for fixing 
horizontal bars, bracing or roof vent sills as per example 
picture to the right. 
Fasten the profiles together by sliding the square headed 
bolts into the channel of the profile and attach to the hole in 
the corresponding bar. Do not tighten the nuts completely 
until the completed frame is square. NOTE THAT ALL CONNECTING PROFILES 
MUST BE FLUSH AND TIGHT TOGETHER TO ENSURE THAT LEAKING IS KEPT TO A 
MINIMUM.  
The door has a zero threshold™. Component 78 at the base of the door on the 
front gable (SECTION 2 FRONT GABLE) is used as a brace to gauge the distance 
between the two components 18 and to make construction easier. This will then 
be removed in SECTION 10 FINISHING. 
 
Glazing 
Glazing must be completed in one operation. Fit the rubber glazing gasket to all 
the profiles as shown in SECTION 8, LOCATING before fitting the glass. Note there 
are 3 different plans for glazing: horticultural glass, toughened glass or 
polycarbonate. Glaze the roof first, then sides and gable ends. Glaze roof vents 
before sliding in from THE END of the ridge bar as shown in SECTION 10 
FINISHING. Glaze the door before hanging as shown in SECTION 7 DOOR. 
 
Finishing Touches 
Fit all plastic parts, i.e. Ridge Cap, Gutter End Caps and Integral Base Corner Caps 
by pushing into place as in SECTION 10 , FINISHING.  
Note: Fit Integral Base Corner Caps before securing down the greenhouse. 
 
Maintenance 
The door sliders and lock will need to be lubricated approximately every 6 
months with an OUTDOOR lubricant to ensure smooth operation.  
The gutters will need to be regularly cleared of leaves and debris to ensure 
efficient drainage. 
 
Replace all broken panes of glass immediately, failure to do so may cause 
structural failure. 
Remove snow loads from the roof. 
Tabla de contenido
loading

Productos relacionados para Eden Bourton

Tabla de contenido