Installation DC Green System
Installation
When installing the unit against a wall, we recommend
the arrangement shown in the illustration above.
1.
Collection sack change/container removal
2.
Operator access to the control panel
3.
Removable service panel (the other panels are not
removable)
Parameters in the static frequeancy changer and timers in
the PLC-programme are adjusted for a reliable function.
Th e parameter P. 133 should be adjusted at the installation
to the required pressure level for the system. Maximum
frequencye P1 must be set up to the value according to the
table. All other settings should not normally be changed.
Changing them without consultation from Dustcontrol can
invalidate the warranty.
Th e exhaust tubing can be hot, presenting a burn
risk. In case non–trained staff reaching it, it should
be heat insulated or be marked with caution stickers
DC 11-Module - 39
.
Part No 94153-D