Haverland PH-21 Manual De Instalacion Y Uso página 18

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLING PROCESS
EN
4
Step 4: Place the power cord plug through the base, bottom pole, middle pole
and top pole. Connect the power cord plug to the socket in the heater head.
5
Step 5: Fit the heater head to the top hollow tube and fix it in position using the
supplied 2 X M4*8 screws.
6
Step 6: Pull the power cord gently out of the base as much as possible. Fix the
power cord under the weighted base using the supplied 4pcs M4 nuts.
18
PH-21
Fig. 5
Fig. 6
Fig. 7
Tabla de contenido
loading

Productos relacionados para Haverland PH-21

Tabla de contenido