UPS start
Start in normal mode
Connect the UPS to the wall outlet (make sure the outlet is grounded). The UPS will immediately start running
a preliminary self-diagnostics test that lasts several seconds. All LED will initially be on to indicate that power
is on and that ByPass is correctly operating. At the end of pre-start, the UPS is in ByPass mode and able, if
necessary, to charge batteries.
INPUT
UPS
LOAD
Testing
Press and hold down the ON [
procedure was successfully completed, the LCD will display that shown in the following illustration.
INPUT
LOAD
UPS
The UPS is now operating correctly. The batteries should be charged for at least 4 hours before simulating a
blackout.
(OPTIONAL: Blackout Simulation) Disconnect the power cord to simulate a blackout. The indicator
will immediately turn off and the amber colored indicator [
The LCD display should appear as illustrated below.
INPUT
LOAD
UPS
Step
V
Code
Hz
Battery
%
] button for about 3 seconds until the unit beeps twice. If the UPS start
Battery
A
V
] will turn on and the system will beep.
V
[
]