Ceiling Ducting; Wall Ducting; House Wiring Location - arietta Dekor Glass 30 Guía De Instalación, Uso Y Mantenimiento

Ocultar thumbs Ver también para Dekor Glass 30:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Ceiling ducting

If the duct will vent straight up to the ceiling:
Use level to draw a line straight up, from the centerline on the template to the
Measure at least 4 -12/16 " from the back wall to the circle center of an 6-½" hole on the ceiling.

Wall ducting

If ductwork will vent to rear:
Use a level to draw a line straight up from the centerline on the
Measure at least 23 - 12/16" (the measure might vary dependig on the elbow used) above the pencil
line that indicates the bottom installation height, to the circle center of an 6-½" diameter duct hole
(Hole may be elongated for duct elbow).

House wiring location

The junction box is located on the top left side of the
Wiring should enter the back wall at least 20" above the bottom of the installation height, and within
5-7/8" and 4-7/8"of the left side of the centerline.
6
template.
hood.
17
ceiling.

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Dekor glass 60

Tabla de contenido