6.2.12.4. Efficiencies
7. CONNECTION SCHEMES
This chapter resume main usual connection schemes that can be applied to PowerCompact3020 analyzer.
This page reports Power balance between Threephase channel (Pin) and Aux
channel (Pout).
NOTE: in case of UPS 3-1 or UPS 3-3, refer to Power measurement pages to get
the proper efficiency ratio related to the selected connection.
- 97 -