Safety Advice; Tools & Equipment; General Advice - Palram Snap & Grow Manual Del Usuario

Ocultar thumbs Ver también para Snap & Grow:
Tabla de contenido
IMPORTANT
Please read
these
instructions carefully before you start to assemble
this greenhouse.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Safety Advice
We
strongly recommend the
use
of work
gloves
during
assembly.
Do
not attempt to
assemble
the greenhouse
in
windy
or
wet conditions.
Do
not touch
overhead power cables
with the aluminum
profiles. Always wear
shoes and safety goggles
when working with extruded aluminum.
Dispose
of
all
plastic bags safely
-
keep
them out of
reach
of
small
children.
The
greenhouse
must
be
positioned
and fixed on
a
flat
level surface. Do
not
lean
against or
push
the greenhouse during construction.
Keep
children away from the assembly
area. Do
not position your greenhouse
in an area
exposed
to
excessive
wind.
Do
not attempt to
assemble this greenhouse if you
are
tired,
have taken drugs
or alcohol or if you
are
prone to dizzy
spells. If using
a
step ladder or power
tools
ensure
that
you
follow
the manufacturers
safety advice. Hot items such
as
recently
used grills,
blowtorches, should kept away from the greenhouse
walls.
We
recommend the greenhouse
is
bolted to
a
concrete
base or slabs (fix
hinges
are
not
supplied). However,
if
you
want to fix directly
in
to the concrete
ensure
there
are no
hidden
pipes or cables
in
the ground before inserting the
pegs.
»
Care &
Maintenance
When
your greenhouse
needs
to
be cleaned,
use
a
mild detergent solution and
rinse
with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels.
For
replacement
parts
-
call
our
service line.
For
additional information
please
visit our web
site:
www.palramapplications.com
Tools
&
Equipment
Tape measure
Work gloves
Plastic
or rubber mallet
Phillipshead screwdriver
Step
ladder
Scissors
Spirit
level
-
For base
alignment
Cloth
»
General Advice
This
multi-part
assembly
is
best achieved by
two
people.
Allow
at least
half
a
day
for the assembly
process.
Site
selection instruction-choose
a
sunny
level
position away from overhanging
trees. If
you
are
fixing
your greenhouse directly to
a
solid concrete
foundation
use
the
pre
drilled
holes
in
the metal
base
supplied.The component parts should
be
checked and laid
out
close at hand. Keep all small parts
(screws etc.)
in
a
bowl
so
they
do
not get
lost.
Sort the parts and check against the contents parts
list.
Carry
out the
assembly steps
in
the order
set
out
in
the instructions.
The
front of the
greenhouse
is
the wall including the
door, and
the
back
is
the opposite wall.
After assembly
fit
the greenhouse to the
base using
connectors
no. 924
and
fit
the whole unit to
a
leveled final
You
may
use
Silicon
lubricant
spray
in
order to help you slide the profiles
on
the
connectors.
Do
not
spray
the Polycarbonate
panels.
Use
the rubber malet if
necessary.
Notes (by steps)
...
Step
4: Profile 848
should
be
placed
on
the left
hand
side
to
be
connected to profile
849. Profile
848
is
the one
with
the connector at the end.
Step
5:
After connecting profiles
816
to
each
other
clean
the connection
area
using
a
cloth.
Place
the cover strip
on
the connection only when
it
is
clean and dry.
Press
the cover strip from one
side
of
the connection to the other
as
mentioned
in
picture
4.
Step
8: Profile 835 & 836
should
be
aligned and
connected according to the illustration
on page
8
a
&
b.
plug
23
should
be
inserted to
each
connection while the two dots
on
the
front of
the plug should
be
in
horizontal position for
easy
assembly.
Step
10:
Use
part
95
as
a
template
in
order
to
measure
the gap between
posts
of
the
greenhouse wall and
roof
area.
Step
11: Profile
841
should
be
placed
on
the
right
hand
side.
Profile 840
should
be
placed
on
the left
hand
side
when viewed from the front.
Step
12: Slide
the panel
566
till
the end
of
the
rail
and insert it
into
it's
final position
as
shown
in
illustration
c
.
Step
19:
Be
careful to assemble the
window
in
the position
as
shown
on
picture
20
a.
profile
809
should
be
placed
while the vent
is
closed
to
cover
any gap. Ensure
profile
809
is
fitted
correctly
as
shown on picture
20
b.The lip on 809 should
face
toward the gutter.
Step 22:
Slide
the panel
566
till
the end
of
the
rail
and insert it
into
it's
final position
as
shown
in
illustartion
a
and
b.
Step 23:
Step inside
the greenhouse and turn
all 23
plugs
a
1/4
of
a
turn
clockwise.
Step 24:
Profiles 814
should
be
inserted from
the four corners of the greenhouse, then insert
profile
815
in
between them.
Step 25:
Ensure
you
use
long screw 450
to
secure
the door
catch
363
as
shown
in
illustration
b.
!
Important
Recommendations
Firmly connect the greenhouse to
a
level
surface
immediately after completion of
the assembly.
Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your warranty to
be
valid.
Tighten
all screws once assembly
is
completed.
Tabla de contenido
loading

Este manual también es adecuado para:

Snap&grow 8x8Snap&grow 8x16Snap&grow 8x20Hg8020

Tabla de contenido