Cascading - Lenze L-force E94AZCEH Instrucciones Para El Montaje

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

2
Electrical installation

Cascading

Cascading
Use the uplink port A1 to cascade the hubs:
The hubs can be connected using a patch or a crossover cable.
Use the MDI / MDIX switch to select the uplink mode as shown in the following figure:
Patch cable
22
Crossover cable
E94AZCEH003
E94YCEH005
EDK94AZCEH DE/EN/FR/ES/IT 1.0
Tabla de contenido
loading

Tabla de contenido