ELECTRICAL CONNECTION
Open the protective cover.
Connect the pH regulation pump to the PH PUMP contacts.
Connect the chlorine regulation pump to the CL PUMP contacts.
Do not place bins containing chemical substances below the POOL STAR, as fumes emitted will damage the
equipment. The recommended clearance is 2 m.
SERBATOI
TANKS
NOTE:
For setting the probes and connecting up the dosage pumps and using the same, please read the
INSTALLER'S INSTRUCTION MANUAL for the PC95.
WARNING
ATTENZIONE / WARNING
2 mt
90 l/h
80 l/h
70 l/h
60 l/h
50 l/h
40 l/h
30 l/h
20 l/h
10 l/h
Ingres so campione
acqua (1/ 2" Gf)
> 20 l/h
5