2-5 Hang the wall plate onto the lag bolt
[01]
2-6 Tighten lag bolts
[01]
2-7 Attach the cable management clamp
[01]
[20]
6901-002142 05
[05]
[06]
[05]
[21]
[06]
[06]
[21]
[19]
Hang the wall plate [01] over the top lag bolt [06].
Insert lag bolts [06] through the wall plate [01] and into the anchors
[05].
CAUTION:
Improper use could reduce the holding power of
the lag bolt. To avoid potential injuries or property damage:
Tighten the lag bolts [06] only until they are pulled fi rmly against
the wall plate [01].
DO NOT over-tighten the lag bolts [06].
OPT
Secure the cable clamp [19] to the wall using screw [20].
11