Overall View; Preliminary Checks - Keyautomation TURBO 250 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43
4
6
10
8
5
Before starting installation it is recommended to carry out the following checks and operations:
1_The structure of the gate must be solid and appropriate.
2_During the run, the gate must not present excessive side disbandment.
3_The lower wheels/rail and the higher roller/guide systems must work without excessive friction.
4_To avoid the disbandment of the gate the sliding gate limit devices, both in aperture and in closu-
re, and a second higher roller/guide must be installed in compliance with current regulations.
5_In pre-existing gates remove any manual lock.
6_Lay the ducts for the energy supply (Ø25-50mm) and for the outside connection (photocell,
flashing device, key selector, etc.) to the base of the gate.

OVERALL VIEW

5
7

PRELIMINARY CHECKS

1
2
3
4
5
6
7
8
9
9
10
5
1
15
Reduction gear
Flashing device
Antenna
Key selector
Photocell
Bollard
Ratchet
Limit device
Warning notice
Check stop
6
8
3
2
10
Tabla de contenido
loading

Tabla de contenido