Figura 3-1. Cámara de medición sin cortar
Curvature of chamber must match that of existing pipeline
A
A
ø 215
ø 8.46"
Figure 3-2. Instalación de cámara.
March 2006
Cut hole into pipeline
to match with the shape
of the meas. chamber
A-A (PN10/16)
a4
Cut chamber to same
radius with existing
W41040300 V3.34
a7
55 ± 2.5
2.15" ± 0.1"
Cross Sectional View
of Installation Chamber
Center cone over cut
out and fillet weld
around entire perimeter
A-A (PN25)
55 ± 2.5
2.15" ± 0.1"
Page 13 of 76