Metalworks CAT020RA Manual De Instrucciones página 11

Arenadora móvil
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CAT020RA - NLFRENES - v1.0 - 30082013
EN
Specifications
Tank capacity:
Hose length:
Working pressure:
Air consumption:
Weight:
Dimensions:
Air supply requirements
Sandblasting requires a large volume of air at high pressure. The efficiency of your sandblaster can be
adversely affected by the use of too small an air supply hose, insufficient air pressure or an overly large
nozzle.
Hose interior
Hose length
diameter
3/8"
15 m
3/8"
7 m
1/2"
15 m
1/2"
7 m
We recommend that air pressure in the range of 4,5 - 8,6 bar will provide the best results.
Spare parts: see pages 18-19
Assembling the sandblaster
1. Refer to the drawing for step 1 , assembling the intake manifold (08). First, attach the pressure gauge
(05), to the top of the intake manifold, turning the gauge so that is can be seen across the top of the tank.
Next, attach the throttling valve (18) to the bottom of the manifold. Attach the nipple connector (7A), to the
throttling valve. Attach the joint pipe (07) , to the manifold.
2. Refer to the drawing for step 2, to assemble the water trap filter (12). Two nipple connectors (07) are
screwed into each side of the filter. On one side, attach the air supply valve (14), to the nipple connector
(07), and then attach the male/female connector (15), to the other side of the air supply valve. When
you're ready to operate the sandblaster, the air hose from the compressor will fasten to the male/female
connector (15).
3. Place the tank (03) on a table with the four clips up. Refer to the drawing for step 3. Screw the water trap
filter (12) and its parts into the hole at the side of the intake manifold. Then screw the open end of the joint
pipe (07) with intake manifold (08) and pressure gauge (05) attached into the threaded hole on the side
of the filler pipe on top of the tank. Again, be sure that the manifold and gauge are vertical.
4. Refer to the drawing for step 4 assembly of the sand outlet valve into the hole at the bottom of the tank.
Attach four parts, in order: Nipple connector (07): sand metering valve (18): nipple connector (07) and
the sand outlet pipe (19).
75 l
3 m
4,5 - 8,6 bar
170-700 l/min
16 kg
560 x 420 x 890 mm
Nozzle interior
diameter
0,10"
0,125"
0,150"
0,175"
Compressor
l/min
(CV)
8,6 bar
2
170
4
340
7
570
10
700
Sand use
per hour
27 kg
45 kg
68 kg
90 kg
®
11
Tabla de contenido
loading

Este manual también es adecuado para:

754750025

Tabla de contenido