COMPACT
Place console and centre equipment in the
12
most convenient place of cabin roof. Once
centred, remove console for later installation.
Fasten supports tightening nuts until outside
13
EPDM joint of equipment is compressed,
between 3 and 6 mm;
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with unit
base, as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
EPDM gasket is compressed
13
between 3 and 6 mm.
Tighten (4) M8 nuts to support and (4) to Unit
14
base.
EPDM gasket
10 mm*
(*) (approx. after tightening)
Base
Bracket
23
Check
compression
thickness using a
tape measure in
the four corners.
EPDM gasket
EN
ES
®
13
14