Operating And Display Elements; Installing And Connecting The Device; Attaching The Control Panel - Gobius 4 Waste Instrucciones De Montaje

Monitor de depósitos
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
Gobius 4 Waste
You can also connect an extra lamp or a buzzer to warn you when the tank
is empty or ¾ full.
You can also connect an analogue gauge parallel with the control panel.
5.1

Operating and display elements

No. in fig. 2,
Designation
page 3
1
Red LED
2
Yellow LED
3
Green LED
4
Blue LED
5
On/Off button
6

Installing and connecting the device

6.1

Attaching the control panel

I
NOTE
z Select a suitable place for the control panel, e. g. in the
head/toilet or near your sewage tank.
z Prepare an opening of at least 4 x 22 mm for the cable of the
control panel.
z You can extend the control panel cable by up to 50 metres with
a standard PC network cable (CAT5).
➤ Connect the control panel using the plugs on control panel cable to the
control unit (fig. 3, page 3).
➤ Carefully remove the protective film from the adhesive strip on the control
panel.
➤ Position the control panel in the required place.
➤ Press the control panel down firmly for a few seconds.
EN
Installing and connecting the device
25
Tabla de contenido
loading

Este manual también es adecuado para:

970442

Tabla de contenido