Weka Holzbau 656.3030.00.32 Instrucciones De Montaje página 4

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
Dear customer
Read these instructions through completely before assembling your product in order to avoid errors in
assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your product has been delivered
complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables you
to check that all the individual parts are present. It should be retained along with the proof of purchase.
Any complaints which may arise can probably be easily rectified with this list. The item numbers on the
packing list do not correspond to the item numbers in the following assembly instructions.
We recommend that 2 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be minor
deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
RECOMMENDATIONS
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol in the
instructions will indicate when this is necessary:
Protect the wood from hours of direct sunlight and moisture.
Wood is a natural product. Fluctuations in colour, knots and cracks are normal and have no influence on
the statics.
A prerequisite for successful assembly, is the anchoring of the studs in the concrete foundation using H
stud supports. The stud supports are available as weka accessories for an additional cost.
A foundation plan can be obtained from your specialist dealer!
In order to facilitate the precise alignment of the H anchors, mark the necessary post clearances on a
piece of guide wood and fix the anchors in place with screw clamps.
Then suspend the H anchors in the base holes already prepared. A minimum clearance of 2 cm is to be
maintained between the upper edge of the foundation and the upper strut.
The required gradient can also be achieved by shortening the studs.
After the holes have been filled with B25 concrete, the foundation must be allowed to set for at least 3
days.
Technische Änderungen vorbehalten! Alle Maßangaben sind ca. Maße.
+
3
 Copyright HRB 3662
Tabla de contenido
loading

Este manual también es adecuado para:

656.3030.01.32

Tabla de contenido