Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
installation
Note: Before installation, please inspect the Unit.
Make sure that nothing inside the package is damaged.
A. Connect to AC utility power
Plug in the AC cord to a wall socket. Please make sure there are no devices plugged into the Unit. Check to see whether
the "SITE WIRING FAULT" indicator is lit. If it is lit, please have the utility wiring inspected by an electrician.
B. Charge the Battery
For best results, charge the battery for twelve hours prior to initial use. The Unit charges its battery whenever it is
connected to the utility power.
C. Turn on the unit
Turn on your Unit by pressing the "On/Off" button for approximately two seconds. You will see the green indicator
light come on.
d. plug in power devices
Plug your devices into the AC sockets on the Unit. To use the Unit as a master on/off switch, make sure all of the
loads are switched on.
Caution: Never connect a laser printer or scanner to the backup sockets along with other computer equipment. A
laser printer or scanner draws significantly more power when in use than when idle. This may overload the Battery Backup.
E Connect the uSB Communication port
A USB port is provided to relay the signal to support Windows. To fully utilize the Belkin Automatic Power Management Software, you will
need to connect the Unit to your computer. Connect the USB cable to the Unit, then connect the other end to your computer's USB port.
F. install Belkin ApM Software
a) platforms supported by Belkin ApM Software.
The following operating system (OS) is arranged by the alphabetical order:
AIX 4.3.3, 5.1, 5.2
Compaq Tru64 Alpha
FreeBSD x86
HP-UX 11.x, 11i.x
Linux
Mac PPC OSX
SCO UnixWare 7.1.1, 7.1.3, SCO Unix 8.0, and SCO OpenServer 5.0.6, 5.0.7
SGI Irix 6.5.x
Solaris / Sparc 2.6, 7, 8, 9 , and Solaris / Intel 2.6, 7, 8, 9
Windows XP / 2003 / 2000 / ME / 98 / NT 4.0 (SP6).
b)
Belkin Automatic power Management Software installation Steps.
For Windows platform
Run setup.exe in the \Windows\Disk1\InstData\VM\ directory of your CD to start the installation program.
Read the information provided, then click Next.
Review the installation options that you have selected. If the options are correct, then click "Install" to begin the installation.
When the installation program is completed, click Done.
For Mac OS X platform
Run setup.app in the \MacOXS\Disk1\InstData\ directory of your CD to start the installation program.
Read the information provided, then click Next.
Review the installation options that you have selected. If the options are correct, then click "Install" to begin the installation.
When the installation program is completed, click Done.
Trouble Shooting
proBlEM
power lEd is not lit
unit will not power on
unit always on battery mode
Backup time is very short
poSSiBlE CAuSE
"On/Off" button not pushed or pushed
less than 2 seconds
Battery voltage is too low
UPS fault
Power cord loose
AC breaker is tripped
Power disturbances have occurred
Battery is not fully charged
Unit is overloaded
UPS fault
SoluTioN
Press the "On/Off" button button more than 2 seconds
Recharge the Unit for 24 hours
Contact Belkin Technical Support at [email protected]
Re-plug the power cord
Reset the breaker
Normal operations
Recharge the Unit for 24 hours
Remove unnecessary power loads (devices
Contact Belkin Technical Support at [email protected]
3- EN
Tabla de contenido
loading

Este manual también es adecuado para:

F6h400exusbF6h400evusbF6h600ukusbF6h600exusbF6h600evusb

Tabla de contenido