Installa On And Pre Opera On; Installa On; Pre Opera On; Feeding Procedures - Skyfood PSE-11 Manual De Instrucciones

2. Installa on and Pre Opera on

2.1 Installa on

The Meat Grinder must be installed onto a leveled and stable surface, preferably 850mm
high from floor.
Before plugging in the machine check if the voltage of the power supply source is the same
as the machine.
Meat Grinder does not come with plug. Plug must be installed in the equipment in
accordance to its power ra ng and local laws.

2.2 Pre Opera on

IMPORTANT
Do not ghten the Locking Ring too much when assembling the Head as an
excessive pressure on the hole plate and knife may lead to their abnormal wear.
First of all check if the machine is firm in its posi on. Before opera on all parts that get in
contact with food must be washed with running water and neutral soap. For doing that
follow the below steps:
2.2.1 Remove Stomper Nº05 (Pic.02) and Pan Nº04 (Pic.02).
2.2.2 Remove the Locking Ring Nº06 (Pic.02) and then pull out of the Head all its internal
components.
2.2.3 Wash all the internal components and replace them inside the head.

2.3 Feeding Procedures

IMPORTANT
Under no circumstances use your hands or any other kind of instrument to push
meat into the feeding throat. Use only the Stomper Nº05 (Pic.02) to do this
opera on.
The processed meat has the func on of lubrica ng and cooling the Head's internal
components. Therefore do not run the machine without load, as it would warm up
and damage the internal components.
46
7

Capítulos

loading

Este manual también es adecuado para:

Pse-12Pci-21gPci-22g