Premier OP-4959 Manual De Instrucciones página 10

Olla a presión (7l)
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OPERATION
1. COOKER PREPARATION
1. Install the knob clockwise. Close the elastic zone and the lid.
2. Put the lid between the handles. Close tightly the cooker with the lid; the elastic zone must adjust in
the same line.
3. Install the knob clockwise. For the elastic zone, move it up until the handles touch together. Ensure it
is tight. Also adjust the lid to the cooker turning the knob one or two turns. When you cook, you will
see that some air vapor goes out from the bottom of the lid. You must empty the entire air from the
cooker only when you put the knob clockwise. Then you must fit the lid tightly to ensure no more
vapor goes out from the cooker. See Picture 1.
2. INSTALL THE VALVE OF LIMITED PRESSURE
Put the valve on the base of the vertical valve. See Picture 2.
P-3
Tabla de contenido
loading

Productos relacionados para Premier OP-4959

Tabla de contenido