Co2 Regulator Installation - Klarstein Big Spender Manual De Instrucciones

Dispensador de cerveza
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

EN
24
Beer Tower Installation
1
Place the Beer Tower on the top of the product and run the beer line into the fridge.
2
Line up the notches on the Beer Tower with the holes in the locking ring and stand
the tower upright.
3
Twist clockwise 1/4 turn while pressing down firmly to lock the tower in place.

CO2 REGULATOR INSTALLATION

Follow these steps to safely install the CO2 regulator and CO2 cylinder. You
must read and understand the following procedures for the CO2 cylinders before
installation.
NOTE: If all your rubber washers & 0-rings are not pre-installed, please refer to your
parts list. Your CO2 cylinder has been shipped empty to avoid any possible accidents
during transpor tation. When you purchase the first keg of beer, you must also have your
CO2 cylinder filled at your local supplier.
Step 1:
High pressure washer installed into
CO2 regulator (may already be
installed).
Step 2:
Attach regulator to CO2 tank connector.
Tabla de contenido
loading

Este manual también es adecuado para:

1003195510031956

Tabla de contenido