ASSEMBLY ONTO THE BOILER
EM 3-E EM 6-E
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4. Insert the burner in the flange so that the
draught tube penetrates into the combustion chamber by the length suggested by the boiler manufacturer. Tighten bolt 1
to lock the burner in position.
EM 9-E
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4 and the possible insulating cord 5. Insert the
burner in the flange so that the draught tube penetrates into the combustion chamber by the length suggested by the boiler
manufacturer. Tighten screw 1 to lock the burner in position.
- 31
-