Lifting Arm Alignment; Operating Manual - Nussbaum POWER LIFT HL 2.50 NT Instrucciones De Servicio

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

12
13
12
Joint bolts
13
Drawbar with lifting arm block

4.10 Lifting arm alignment

I i
After lift assembly, it may be the case that the
lifting arm is at the lowest position on the base
plate (2) and is difficult to move.
14
View from below
14
Set screws
• There is an option of setting two set screws (14) on
the bottom of the lift rails to a certain height so
the carrier arms are free and are easier to move.
56
5

Operating manual

When handling the lift, it must abso-
13
12
lutely comply with safety regulations.
Carefully read the safety regulations in
Section 3 before first operation!
To prevent operation by unauthorised
personnel, secure the main switch (15)
after the working height is reached.
Operating element
007
Operating elements
15
Main switch
16
CE-Stop button
18
19
14
007
Operating lever
17
Push = LIFT
18
Home position
19
Pull = LOWER
Version 1.0
CE-Stop
20110002 POWER LIFT HL 2.50 NT - HYMAX HL 5000 PH OPI
15
16
009
17
18
010
Tabla de contenido
loading

Este manual también es adecuado para:

Hymax hl 5000 ph

Tabla de contenido