Gather the required tools and parts before starting installation. Read and follow the instructions provided with any tools listed here.
Configuration: Stand-Alone Side Searing Burner (760-0024)
Tools needed
◼
Tape Measure
◼
Small, flat-blade screwdriver
◼
Flat-blade screwdriver
◼
#2 and #3 Phillips screwdriver
◼
Level
Parts Supplied for 20 lb LP Gas Installation
◼
Gas pressure regulator/hose assembly set for 11" WCP LP gas
◼
LP gas fuel tank tray
Parts Supplied for Conversion to Natural Gas
◼
2.08 mm Natural gas orifice for side searing burner (Model 760-0024)
Parts Needed for Conversion to Natural Gas
◼
Natural gas conversion kit (Order Part Number 710-0003). Natural gas conversion kit includes:
◼
Natural gas regulator (marked "Natural Gas Regulator")
◼
10 ft (3.0 m) PVC flexible gas supply hose with quick
connector
◼
5.9 in. NG regulator hose
◼
Gas line shut off valve
◼
½" male pipe thread nipple for connection to pressure regulator
◼
LP gas-resistant pipe-joint compound
◼
CSA design-certified outdoor flexible stainless steel appliance connector (4-5 ft [1.2-1.5 m]) or rigid gas supply line as needed
INSTALLATION REQUIREMENTS
Tools and Parts
◼
Wrench or pliers
◼
Pipe wrench
◼
Scissors or cutting pliers (to remove tiedowns)
◼
Noncorrosive leak-detection solution
◼
6 mm wrench
◼
6 mm nut driver
◼
Hex key
11