SMA Solar Technology AG
Figure 3.9 LCS tool - List of all inverters connected to the
SMA Inverter Manager
10. If sufficient PV power is present and the grid code
conditions are met, the inverters are connected to the
grid.
Figure 3.10 LCS tool - Commissioning report
Installation Guide
11. Upon commissioning, it is possible to download a
commissioning report under the menu "Reports". The
report contains information about inverter settings,
including actual disconnection values for each inverter.
See figure 3.10.
3 Initial Setup and Start
STP60-10-IA-xx-10