Installation instructions
and use of the energiser
AKO Sun Power S250
5. Connecting accessories
7. Setting up the Sun Power S250
To install your Sun Power S250, start by driving the earth spike (n°8) into loose, damp soil up to the first hole, preferably as close as
possible to the fence. Then connect the fence connection cable (#5) to the conductor (wire, tape or cord).
For optimum operation of the solar panel, please ensure that it faces south, so as to benefit from the longest period of sunlight. Avoid
placing the Sun Power S250 in the shade of bushes, trees, buildings, etc. Once the location has been chosen, turn the switch to position
"1" and check the voltage on the fence using a special fence tester.
8. Description of indicator lights
The Sun Power S250 energiser is equipped with
an LED display to check the voltage delivered
(flashing green LED = voltage greater than
3000 volts) and the state of charge of the
battery (red = battery discharged). A flashing
blue LED also indicates that the solar panel is
operating.
9. Guarantee
The Sun Power S250 energiser comes with a 3-year guarantee from the date of purchase. Please make sure you keep the purchase
invoice as proof of warranty.
This warranty does not cover damage caused by misuse, failure to follow the instructions in this manual or deep discharges of the
battery (voltage below 11.8 Volts). Batteries that have been dismantled, opened, cracked or show signs of impact or corrosion will be
excluded from any warranty.
For further information, please contact our team by e-mail at :
The Sun Power S250 energiser is
supplied with fence connection cable (n°5)
and earth connection cable (n°6).
To connect them, unscrew the red terminal
on the energiser, then insert the fence
connection cable (n°5).
Then unscrew the black terminal from the
energiser and insert the eyelet for the earth
connection cable (no. 6). Screw the red and
black terminals back onto the energiser by
hand.
Kerbl France - www.kerbl.fr
6. Earth spike connection
Voltage over
3000 Volts
EN
To connect the earth
connection cable (no. 6) to
the earth terminal (no. 8),
use the screws supplied
(no. 7).
We advise you to keep
the extra nuts and bolts
in case you lose them.
Solar panel
operating
indicator
Kerbl France Sarl
3, Rue Henri Rouby
BP 46 - ZI SOULTZ
68501 Guebwiller Cedex - France
Tel: +33(0)3 89 62 15 00
Fax: +33(0)3 89 83 04 46
12