Craftsman 24919 Manual Del Operador página 14

Ocultar thumbs Ver también para 24919:
Idiomas disponibles

Idiomas disponibles

15. Installthechute tubeextensionontothe chuteelbowby lining up
thetabs and slidingthe adapteroverthe chute elbow,as in Fig.
4-22.Securethe chute adapterby stretchingthe chutestrap and
hookingit onto the grass-catcher p in previouslyinstalled.
NOTE: Thegrooveon the upperchute shouldbe alignedwith the
upper chute support,as seenin the insetof Fig. 4-24.
Figure 4=24
16.
Figure 4=22
With the grass catchercover open, install the discharge chute
overthe chute extensiontube, as seen in Fig. 4-23,and rest the
top end intothe upperchute support installedon the right-hand
side of the bin support assembly.See Fig. 4-24.
Bagger Operation
NOTE: Whenbothgrass binsare full, placethe tractoron a firm, level
surface,disengagethe PTO,turn the tractorengine off and set the
parkingbrake.
1.
Flipthe seatup.
2.
Lift up grass bin coveras instructed on Page 12 in Step7. Do not
removethe chutetubeassemblyfromthe tractor.
3.
Removethe grass binsby liftingthese up and movingthe bins
awayfrom the bin supportassembly.
4.
Emptythe grassclippingsat a properdisposalsight,usethe
handleat the bottomof eachgrass bin. Holdingthe bin firmly,
emptythe contents
5.
Replacegrass bins,close lid, flip downseat,restartyourtractor
and resumecuttingyourgrass.
Figure 4=23
14
loading