Step 22
H4 x 4
E
A
H16
Counter sunk holes
a) Ask for assistance to stack the Upper Bunk onto the Bed Connector Pins (H14) on the Lower
Posts and fasten the Upper Posts (E, F, G and H) in place with four 45 mm Bolts (H4).
b) Proceed to insert two 19 mm Screws (H11) through the countersunk holes of Metal Bracket
(H16) and securely screw into place.
NOTE: Make sure that the Upper Bunk sits completely on top of the posts and the pins go all
the way, not leaving any gaps.
H11 x 2
E
H14
H4
A
H11
F / G / H
B / C / D
F
B
H4
H14
H
G
D
C
32 |
P a g e