Step 3: Fill the notch with mortar and set the waterfall in the mortar as shown below. Make sure
that the lip support is in place to prevent debris from getting in the waterfall. Note that the
edge of the waterfall lip should clear the finished tile line by 3/4". The lip should be level on
the board and fully supported by the mortar.
Step 4: Wait for the mortar to fully cure and then remove the board.
Step 5: Glue the ext. deck lid collar onto the waterfall unit with PVC glue. If the waterfall is installed
in a raised wall, a 3" PVC pipe can be used to extend the distance between the top of the
waterfall unit and the deck surface, allowing access to the LED light.
Water Line
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
Waterfall
Assembly
Waterfall Front View
Deck Lid Cover
Deck Lid Collar
Electrical Line
Mortar Bed
8" Bond Beam
OR
Electrical Line
Water Line
Lip Support
Board
Deck Lid Cover
Ext. Deck Lid Collar
Optional 3" PVC Extension Pipe
4