American Standard Ovation Curve B8014A-ST3R Manual Del Propietário página 3

Idiomas disponibles

Idiomas disponibles

RECOMMENDED TOOLS AND MATERIALS
Level
A
Pipe Wrench
E
Standard Woodworking Tools
I
MATERIALS
Exterior Rated Screws
Silicone Sealant
Drop Cloth
OPTIONAL: Mortar Mix or Grout
BEFORE YOU BEGIN
Inspect your product thoroughly before installing. Take extra care in handling surfaces
of the base and use only non-abrasive cloths to avoid scratching. Observe all local plumbing
and building codes.
INSTALLATION INSTRUCTIONS
IMPORTANT GENERAL INFORMATION
This unit is best installed by two people.
Cover drain with tape prior to installation to prevent the loss of small parts.
Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using Box
Contents as a reference. Before discarding the carton check to see that no small hardware parts have
fallen to the bottom of the box. If any parts are damaged or missing refer to the description noted in the
instructions when inquiring about replacements.
When installing coordinating bath walls, additional studs may be required.
Refer to those installation instructions prior to installing base.
Take extra care when driving nails or screws to avoid damaging the base.
1234567891
Tape Measure
B
Caulking Gun
F
Pencil
F
0 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Square
C
Slip Joint Pliers
G
Screwdriver
D
Personal Safety
Equipment
H
loading