RIDGID RD903600 Serie Manual Del Operador página 17

Idiomas disponibles

Idiomas disponibles

MAINTENANCE
STORAGE
When preparing the generator for storage, allow the unit to cool completely then follow the guidelines below.
STORAGE TIME
Less than 2 months  Drain gasoline from tank and dispose of in a suitable container according to state and local
2 months to 1 year
 Drain fuel from carburetor.
 Drain gasoline from tank and dispose of in a suitable container according to state and local
1 year or more
 Drain fuel from the carburetor.
 Remove spark plug.
 Drain gasoline from tank and dispose of in a suitable container according to state and local
 Put a tablespoon of engine oil into the spark plug cylinder. Turn the engine slowly with the pull
 Reinstall spark plug.
 Change engine lubricant.
After removal from storage:
 Fill with fresh gasoline.
NOTE: If storing gasoline in suitable container for later use, make sure gasoline has been treated with fuel stabilizer
according to stabilizer manufacturer's instructions.
MAINTENANCE SCHEDULE
Check Engine Lubricant
Change Engine Lubricant
Check Air Filter
Clean Air Filter**
Change Air Filter
Check/Adjust Spark Plug
Replace Spark Plug
Check/Adjust Idle Speed
Check/Adjust Valve Clearance*
Clean Fuel Tank and Filter*
Check Fuel Tube
Replace Fuel Filter
Check all hose/tube connections
Inspect fuel tank vapor vent (if
equipped)
* These items should only be carried out by an authorized service center.
** See engine manual for maintenance schedule for this item.
NOTE: Maintenance should be performed more frequently when generator is used in dusty areas. When generator
has exceeded the maximum figures specified in the table, maintenance should still be cycled according to the
intervals of time or hours stated herein.
ordinances.
ordinances.
ordinances.
rope to distribute the oil.
Before
each use
PRIOR TO STORING
After 1st
Every 3
month or
months or
20 hours of
50 hours of
operation
operation
17 — English
Every 6
Every year or
months or
after 300 hours
100 hours of
of operation
operation
loading