Suzuki 57100-1081 Serie Instrucciones De Instalación página 5

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 73
4. Apply grease to the handlebar.
5. Apply grease to the throttle
cables and cable pulley.
99000-25480
SUZUKI SUPER GREASE
"A" or equivalent
6. Insert the Grip Heater (R)
② into the handlebar. Then,
install the throttle cable No.1
first, then No.2.
7. Install the Grip Heater (R) ②
to the switch box.
8. Fit the stopper pin of the
switch box to the hole in the
handlebar and tighten screws.
Order of tightening
① rear ⇒ ② front
Screw:
3N . m(0.3 kgf-m, 2.0 lbf-ft)
NOTE:
After tightening screws of the
switch box, check to make sure
that the switch box does not rattle.
9. Reinstall the existing handle-
bar balancer that was removed
in step 1.
Bolt (M8)
23N . m(2.3 kgf-m, 17.0 lbf-ft)
WARNING
Open and close the throttle,
and make sure if there is any
catch in the throttle operation.
Throttle cable No.1
Switch box
Hole
Stopper
pin
Throttle cable No.2
GENUINE SUZUKI ACCESSORIES
5
/17
loading