Olimpia splendid Sherpa S3 E Manual De Instalación página 58

Ocultar thumbs Ver también para Sherpa S3 E:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 181
6 INSTALLATION PRECAUTIONS
6.1 Dimensions
4/6 kW
(unit: mm)
I
F G
E
D
B
A
Fig: 6-1
Model
A
4/6kW
1008
8/10/12/14/16kW
1118
6.2 Installation requirements
Check the strength and level of the installation ground so that the unit may not cause any vibrations or noise during the
operation.
In accordance with the foundation drawing in the figure, fix the unit securely by means of foundation bolts. (Prepare four sets
each of Φ10 Expansion bolts, nuts and washers which are readily available in the market.)
Screw in the foundation bolts until their length is 20 mm from the foundation surface.
Φ10 Expansion
bolt
Rubber
shocking
proof mat
Solid
ground
≥80
or roofing
(unit: mm)
Fig: 6-3
H
C
B
C
D
375
426
663
456
523
656
≥100
Concrete
basement
h≥100mm
09
8/10/12/14/16 kW
I
F G
E
B
Fig: 6-2
E
F
G
134
110
170
191
110
170
Fig: 6-4
(unit: mm)
H
D
C
A
H
I
712
160
865
230
loading