Operating Instructions - Stihl HT 56 C Manual De Instrucciones

Ocultar thumbs Ver también para HT 56 C:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

English
Push the cap (4) onto the end of the
N
front drive tube.
Make sure the ends of the drive
tube are clean.
Connecting the Drive Tube
Pull the cap off the front drive tube
N
and keep it in a safe place.
Put the powerhead on the ground so
N
that it rests on the machine support.
Examine ends of drive tube for dirt
N
and clean if necessary.
6
2
Slide the lug (5) on the front drive
N
tube (2) into the slot (6) in the
coupling sleeve as far as stop – if
necessary, turn the front drive
tube (2) back and forth while
pushing it home.
26
4
When correctly installed, the red
line (7) (arrow point) must be flush with
the end of the coupling sleeve.
Tighten down the star knob (1)
N
firmly.
Attach the shoulder strap to the
N
carrying ring.
5
7
1

Operating Instructions

During break-in period
A factory-new machine should not be
run at high revs (full throttle off load) for
the first three tank fillings. This avoids
unnecessary high loads during the
break-in period. As all moving parts
have to bed in during the break-in
period, the frictional resistances in the
engine are greater during this period.
The engine develops its maximum
power after about 5 to 15 tank fillings.
During Operation
Do not make the mixture leaner to
achieve an apparent increase in
power – this could damage the
engine – see "Adjusting the
Carburetor".
Check chain tension frequently
A new chain has to be retensioned more
often than one that has been in use for
some time.
Chain cold
Tension is correct when the chain fits
snugly against the underside of the bar
and can still be pulled along the bar by
hand. Retension if necessary – see
"Tensioning the Saw Chain".
HT 56 C

Capítulos

Tabla de contenido
loading

Tabla de contenido