brondell SMB-15 Manual Del Propietário página 10

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PRODUCT INSTALLATION
Installing the Bidet Attachment (contd.)
3. Connect Bidet Hose To Bidet Attachment.
Connect the open end of bidet hose to the cold connection
behind the bidet attachment.
NOTE: If you have already installed the hot water
supply cap over the hot water supply on your SMB-25
Dual Temperature model, skip to step 5.
4. Connect Hot Water Tube To Bidet Attachment
(For SMB-25 Dual Temperature Model Only).
a. Take the hot water tubing pressure connector and
remove the pressure cap.
b. Slide the pressure cap over the open end of the of hot
water flex tubing with the inside threads facing towards
the open end.
c. Push the pressure connector into the open end of the
of hot water flex tubing with the washer facing out.
IMPORTANT: Be sure to slide the hot water flex tubing
over the pressure connector until the tubing slides
past the "lip" of the pressure connector and it cannot
go any further.
d. Hold the pressure connector up against the hot water
inlet on the bidet attachment. Slide the pressure cap
along the tubing and screw the cap onto the hot water
inlet until the pressure connector is secure.
5. Turn On Water Supply & Check For Leaks.
a. Open the main water supply valve slowly and check for
leaks.
b. Wait 5-10 minutes, check again, and if there are no
leaks, continue.
NOTE: If there is any leaking, check all rubber washers and make sure all water connections
are tight and secure. If necessary, you can use plumbers tape for any leaking connections.
TIP: If spray direction is off-center after installation or does not rest properly under toilet
bowl rim, loosen mounting nut, reposition the control valve body, and secure back in place.
Depending on your preferences or body composition, the perfect position may require
some readjustment.
8
Step 3
Step 4b
Step 4c
Step 4d
Tabla de contenido
loading

Este manual también es adecuado para:

Smb-25

Tabla de contenido