4.4
Electrical connection
An AUTHORISED TECHNICIAN should always carry out the appliance's electrical connection.
The legal standards in force in each country regarding connection to the mains should be taken into
account.
Check that the mains voltage corresponds to that indicated on the nameplate.
The electric cable should be flexible, with an oil-proof covering, and it should not
The cross-section of the power cable must be suitable for the rated current of the
The appliance must be connected to earth using the connection on the appliance
When several appliances are installed in series, they should be earthed to each
An easily accessible omnipolar magneto-thermal circuit breaker of suitable
An easily accessible differential protection device of suitable capacity should be
If any faults are observed during the installation, the supplier should be notified
Before replacing the switchboard cover, fasten the electric supply cable
The manufacturer will not be held liable for any personal or material damage to the
machine resulting from incorrect installation or failure to comply with the
manufacturer's specifications.
4.5
Gas connection
An AUTHORISED TECHNICIAN should always carry out the gas connection of the appliance.
4.6
Conversion to other types of gas
If the appliance is prepared for a different type of gas to the one available in the installation, you
should proceed as follows:
1. Disconnect the gas supply to the appliance if connected (Any change to the conditions of the
gas circuit must be carried out by an AUTHORISED TECHNICIAN)
2. Burner conversion
a. Open the door to access the burner.
b. Remove the burner injectors and replace with the correct model according to the gas
c. Set the air control to position H (table 3) depending on the gas to be used.
weigh less than the cable in an ordinary sleeve made of standard polychloroprene
or an equivalent synthetic elastomer (H05RN-F).
machine. (Table 2)
connection terminal board. The earth cable should be longer than the other wires.
The manufacturer will not be held liable for damage originated by failure to observe
this requirement.
other using the point assigned for this purpose, located at the rear of the appliance.
capacity should be installed next to the appliance, with a minimum gap of 3 mm
between contacts. This switch should be used to disconnect the appliance during
installation, repair, cleaning and maintenance work. It should have locking/labelling
capacities. The manufacturer will not be held liable for damage originated by failure
to observe this requirement.
installed next to the appliance. The manufacturer will not be held liable for damage
originated by failure to observe this requirement.
immediately.
tightly to the stuffing box.
The general installation must have a mains tap and a pressure regulator and it is
also advisable to install a shut-off cock on each individual appliance.
A pipe of at least Ø 12 x 10 mm should be used for the gas connection, together
with a ¾" nut to connect to the fryer.
to be used (Table 3).
27