Dusting and Spreading
Mode
SR 450 only.
Metering lever
A
1
B
1
The discharge rate is infinitely variable
with the metering lever (1).
N
Position A (metering lever vertical –
feed closed
N
Position B (metering level parallel to
blower tube) – feed open
Conversion from mistblowing to
dusting and spreading mode
N
Empty and clean the solution
container – see "After Finishing
Work".
SR 430, SR 450
N
Close valve lever (1) for solution
feed.
2
N
Close the metering lever (2) for
dusting and spreading mode.
Solution container
A
1
B
The selected operating mode is
indicated by the symbols on the
metering unit's housing.
N
Position A – Mistblowing mode
N
Position B – Dusting and spreading
mode
N
Insert a suitable tool (e.g.
screwdriver) in the two recesses
(arrows) to loosen the strainer (1).
N
Pull the strainer (1) upward and out
of the solution container.
English
23