-
Remove the two bands that fix cardboard to pallet.
-
Unscrew the saw form pallet.
-
Remove cellophane machine wrapping and all other
packing inside.
-
Two people are at least necessary to move the machine
and they have to catch it from working surface (Fig.
3.3.2) - it weights 55 Kg.
-
"ATTENTION!"
To move the machine are necessary two people.
3.3.1
Disposal of the packing
The packing components - cardboard, nylon, wood - can
be considered solid urban refuse and can therefore be dis-
posed of normally. If the machine is delivered to countries
with special regulations, the packing must be disposed of in
accordance with the laws in force.
3.3.2
Handling the machine
Lift the machine with a forklift truck of suitable capacity. Check the stability and
positioning of the load on the forks, in particular on rough, slippery or sloping sur-
faces. When the machine is being moved, keep the load as low as possible in or-
der to ensure greater stability and visibility. Widen the forks to obtain maximum
stability.
3.4
Connection to the electrical system
- Connect a 16 Amp plug, provided by manufacturer, to the electrical supply cable.
Check that the electrical power supply line corresponds to the value on the ma-
chine identification plate. All work must be carried out by specialist personnel only,
specifically authorised by the person in charge. Connect up to a mains with effi-
cient earth socket.
19
Fig.3.3.1
Fig.3.3.2