Pfister PARISA LG 534 Serie Manual Del Usario página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

12
12C
12A
12 PULLOUT HOSE CONNECTION
From underneath sink, push Quick Connect Housing (12A), located on the end
of the Pullout Hose (12B) firmly upward onto Receiving Tube (12C), until unable
to push any further. Pull down on Quick Connect Housing (12A). If the housing
and Inner Collet (12D) separate slightly but do not pull off, the Receiving Tube
(12C) quick connect is secure.
13
13A
13D
13B
13C
HOT
13 WATER SUPPLY LINES
Gently separate hot and cold supply tubes (13A), approximately three inches
apart. Connect water Supply Lines (13C) to Faucet Inlets (13B). Hot water
supply line goes to hot inlet fitting indicated by red tag (13D). (Supply lines
and fittings are not included.) Please follow manufacturer's instructions when
installing supply lines.
14
14B
14 SECURING INLET LINES
Do not cross Pullout Hose Connection (14A) with Inlet Supply Tubes (14B) to
avoid binding, jamming and interference with the movement of the pullout hose.
12C
12D
12A
12A
12B
13A
13B
13C
COLD
14B
14A
ENGLISH
15
15 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
16 FLUSHING
16
To prevent damage to the internal parts of your faucet from debris that may
have collected in the water lines, it will be necessary to flush the faucet. Lift
the faucet handle (16A) up to the full on position. Run water for one minute.
Repeat in hot and cold positions.
17 SPRAY HEAD INSTALLATION
17
17A
17A
Assemble Sprayhead (17A) to Pullout Hose (17B) by turning the metal Hose
Fitting (17C) clockwise.
Caution: do not over tighten!
18 SPOUT FUNCTION
4
16A
17C
17B
17C
Tabla de contenido
loading

Tabla de contenido