Upper Half Of Workbench (2 Parts) - Porter Cable PCSRW4800 Manual De Instrucciones

Idiomas disponibles

Idiomas disponibles

Fig. I

UPPER HALF OF WORKBENCH (2 PARTS)

PART 1: TOP UPRIGHT FRAME INSTALLATION (FIG. J-M)
NOTICE
It is recommended that one person holds the upright frames in place while a second person installs
the stacking plates (17).
1.
Remove the top frame caps by using a small mallet or screwdriver (not included) to lightly tap
from the underside of the caps. (Fig. J)
2.
Place a stacking plate (17) on each upright frame by sliding the tabs into the top slots. (Fig. K)
3.
With the help of an assistant, stack an upright frame on the lower assembly of the Workbench.
The stacking plates (17) will need to be slid up on the lower upright frame in order to disengage
the tabs and get all four tabs to properly seat into the slots on the stacked uprights. Pull the
stacking plate (17) down to engage all four tabs on the upright frames. (Fig. K and L)
4.
Repeat step 3 on the stacked uprights on the opposite side.
5.
Insert two locking pins into each of the four stacking plates (17) to ensure that the upright
frames stay in place for the remainder of the Workbench assembly. If the locking pins (10) do
not easily slip into place, lightly tap the stacking plates (17) with a mallet (not included) to seat
the tabs correctly. (Fig. M)
Fig. J
TOP CAP
Fig. M
17
10
10
MOUNTING
HARDWARE
Fig. K
1
17
Fig. L
9
17
loading