Kohler Sterling 7104 Serie Guia De Instalacion página 6

Ocultar thumbs Ver también para Sterling 7104 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Framing Construction (cont.)
NOTE: The bath supports must rest directly on a level subfloor.
Build a dam to keep the flooring material in the desired area. Be sure to dam the drain area.
Spread and level a layer of cement or mortar on the subfloor where the bath supports will rest.
Allow the cement or mortar material to cure.
Remove the dam.
1015404-2-D
All manuals and user guides at all-guides.com
6
Sterling
Tabla de contenido
loading

Tabla de contenido