1.5 Reconnect cable to the pump and push control retainer
with the control onto the back insulation.
Now the front insulation can be slipped over the control
retainer and be pushed onto the back insulation until it
clicks into position.
1.6 Flush solar installation thoroughly, then fill it with solar
liquid and carry out leakage test. Set the pump speed to
suit either the number of collectors or the collector sur-
face area. If required, fine adjustment is carried out with
the ball valve within the flow measuring device.
1.7 The supply and return pipe are to be insulated up to the
thermal insulation.
1.8 Functional description and setting of the control is de-
tailed in the separate operating instructions supplied
with each transmission station.
Flow chart:
Technical data:
Max. excess working pressure:
Max. working temperature:
Safety valve:
Circulation pump
Grundfos/Wilo:
Nominal voltage:
Power consumption:
Phase 1
Phase 2
Phase 3
Max. pump head:
Max. pump capacity:
Flow measuring device:
Flow measuring device:
6
Dimensions:
Transmission station "Regusol EL-130"
(illustr. without control)
·
Flow rate V [l/s]
6 bar
120°C
Filling the installation:
6 bar
UPS 25-60/ST 25/6
AC 230 V
45 W/45 W
65 W/65 W
90 W/85 W
6 m
4.5 m
3
/h/3.5 m
3
/h
1-6 l/min.
2-15 l/min.
Operating position:
250
G 1
G 1
G 1
G 1
100
L/MIN
15
Flow measurement
12
display
9
7
5
2
Supply
Handle approx. 45°,
check valve opened
Supply
Return
60
60
60
60
40
80
40
80
40
80
40
100
100
20
20
20
100
20
120
120
0
120
0
0
120
0
°C
°C
°C
°C
Return
Ball valve closed
60
60
40
80
40
80
100
20
20
120
0
120
0
°C
°C
80
100
120
Check valve
Slit in horizontal position
100
loading

Este manual también es adecuado para:

Regusol el-130