oventrop Regusol E-130 Guia De Inicio Rapido página 5

Grupo de transmisión
Idiomas disponibles
  • ES

Idiomas disponibles

Transmission station "Regusol E-130" and "Regusol EL-
130" with pre-assembled, integrated microprocessor dri-
ven control.
The transmission station is supplied with a detailed in-
struction manual of the control manufacturer!
Compared to the "Regusol E-130", the "Regusol EL-130"
is equipped with a deaerator for the deaeration of the
heat transfer medium.
Safety notes
The safety notes are to be observed.
Installation, initial operation, maintenance and repairs have
to be carried out by authorised and qualified trade persons.
(EN 5011 part 1 and VDE 1000 part 10)
Installation notes
The transmission station is supplied pre-assembled. The
compression fittings are to be ordered separately.
The transmission station always has to be mounted at a low-
er level than the collectors so that no steam may penetrate
the expansion tank in case of stagnation.
If the expansion tank is mounted at the same or at a higher
level, a hydronic siphon is required. The installation has to be
flushed with fresh water after each draining operation.
The transmission station is not suitable for direct contact
with swimming pool water.
Assembly notes
1.1 Remove transmission station from the packaging.
Pull the front insulation (1) over the control retainer (2)
whilst pushing the latter against the back insulation (3).
Now the control retainer can be pulled off the back
insulation together with the control (4). Loosen the plug
connection of the cable at the pump (5).
Remove transmission station (6).
1.2 For each wall mounting device (7), drill 8 mm holes at a
distance of 262 mm.
Fix mounting device by screwing it onto the wall and en-
gage back insulation. Now push transmission station on-
to the fixing clips of the wall mounting device.
1.3 Connect pipework of the solar circuit to the upper and
lower connections with the help of compression fittings.
When using soft or thin walled pipes, reinforcing sleeves
have to be used for the additional stabilization of the
pipe. The pipe ends must be cut at right angles and
have to be free of burrs. Introduce pipe until stop and
firmly tighten the compression fittings by using a span-
ner. Hold firm while tightening.
1.4 Screw safety group (8) onto the ball valve. Mount dis-
charging pipe of the safety valve towards the collecting
basin and the connecting pipe of the safety group to-
wards the expansion tank.
Valves, controls + systems
Transmission station
Transmission station
Transmission station "Regusol E"
"Regusol E-130"
with deaerator
"Regusol EL-130"
Installation instructions
5
loading

Este manual también es adecuado para:

Regusol el-130