Cable Management
Cords may be routed using cable ties (I).
5
Attach cable tie anchor (J) to top or bottom of wall arm (A) using 8-32 x 1/4" phillips screw (K) as shown in
fi gure 5.1.
Secure cables to top or bottom of wall arm (A) using cable ties (I) as shown in fi gure 5.2.
fi g. 5.1
WALL ARM (A)
Tension Adjustment
• Do not remove screw or loosen screw until it is no longer engaged with the mount. Doing so may cause the display
to fall.
• If screws become loose over time, tighten screws as necessary. Tighten screws to 50 in. • lb (5.6 N.M.) maximum
torque.
If more or less tension is desired in the arm pivot points, do the following:
6
• To increase tension, turn tension screw(s) clockwise using 5mm allen wrenchs (L). NOTE: Tighten screws to
50 in. • lb (5.6 N.M.) maximum torque.
• To reduce tension, turn tension screw(s) couter-clockwise using 5mm allen wrenchs (L). NOTE: Do not loosen
more than half a turn.
K
J
WARNING
TENSION SCREWS
9 of 38
All other brand and product names are trademarks or registered trademarks of their respective owners.
fi g. 5.2
CORD
I
ISSUED: 02-15-10 SHEET #: 095-9317-3 07-26-11
© 2011, Peerless Industries, Inc. All rights reserved.
I
Peerless Industries, Inc.
3215 W. North Ave.
Melrose Park, IL 60160
www.peerlessmounts.com