7
Scope of delivery
DP 109
consisting of:
8
Measurements
BEKO recommends the indirect installation with measuring chamber
8.1
Measurement with measuring chamber, connection via plug nipple
1. Preparation of the measuring point
Prior to measurement, allow compressed air to flow off at the tapping point to remove condensate and dirt
deposits. This reduces contamination of the DP 109 and of the measuring chamber.
Stagnant air leads to long response times.
In the event that condensate emerges at the measuring point, you should examine the compressed-air
processing before starting the measurement.
DP 109
1. DP 109 dew point measuring device up to 232 psi
2. Standard measuring chamber up to
3. Connecting cable 5m, M12 plug, open ends
Scope of delivery
232 psi
with quick-release coupling
11