2.3.
VISUAL INSPECTION
A. Due to the nature of the device, typical inspection of filaments and anode rotation is not possible, since the port is opaque.
Be certain that connections are connected to stator power source as outlined in Stator Cable and Electrical Connections in
the Product Data Sheet.
2.4
BREAK-IN PROCEDURE
A. Warm-up exposure 200 MA, 80KV, 2 Sec. 6 times (5 sec. between exposures)
B. Three 300 MA, 0.1 Sec. exposures, from 90-120 KV at 10 KV intervals.
2.5.
STARTING TIMES AND CALIBRATION
A. Same as for conventional tubes. (Note MA monitoring in 2.2 (A) Center Section Current.)
X-RAY
PRODUCTS
FIGURE 2-1
X-RAY TUBE ASSEMBLY AND
INSTALLATION MANUAL
4476
2
2–11