Kohler CORALAIS K-15801 Instrucciones De Instalación página 4

Idiomas disponibles

Idiomas disponibles

ESCUTCHEON/HANDLE INSTALLATION
Complete the finished wall and discard the plaster guards(2).
Apply a bead of plumbers putty or other sealant around the edge
of the escutcheons(9) according to the putty manufacturer's
instructions. Install the escutcheons over the threaded
sleeves(10) and align on the wall.
Carefully remove any excess plumbers putty or sealant from
around the escutcheons.
Assemble Stacked(20), Euro(21), Cross(22), and Lever(23)
handles by aligning the "D" shape of the valve stem(24) and hole
in handle. For lever handle ensure O-ring (25) is behind threads.
Secure handles with screw and finishing trim.
CALL US FOR HELP
Here's what you need to do if you require service:
First review the installation instructions to ensure correct installation. For additional assistance in the USA, call our Customer
Service Department for direct help. You may also contact us at our web site listed below.
A
1010453-2-
Call 1-800-4-KOHLER within the U.S.
Call 001-877-680-1310 within Mexico
Call 1-800-964-5590 within Canada
www.kohler.com
4
Finished Wall
2
Plumbers Putty
24
20
LEVER HANDLE OPERATION
On
Off
Hot
Kohler Co., Kohler, WI, U.S.A.
10
9
25
23
22
21
On
Off
Cold
loading

Este manual también es adecuado para:

Coralais k-15801mCoralais k-15802Coralais k-15802mCoralais k-15803Coralais k-15803m