Kohler CORALAIS K-15801 Instrucciones De Instalación página 2

Idiomas disponibles

Idiomas disponibles

DETAILED INSTRUCTIONS
BEFORE YOU BEGIN
CAUTION: Risk of product damage. Remove the
aspirator, plaster guards, and valve units before you
apply heat to yoke.
FRAMING/YOKE INSTALLATION
Determine location of support framing for yoke, spout, and
showerhead. Install support framing as needed.
CAUTION: Risk of product damage. Remove the
aspirator, plaster guards, and valve units before you
apply heat to yoke.
To prevent damage to the yoke components due to heat while
soldering, remove the valve units, plaster guards, and the
aspirator.
Yoke has two-sided pipe adapters(4) that can be reversed for
use with either 1/2" N.P.T. pipe or copper tubing(11). Connect hot
and cold supplies to yoke, so they are between 2" (5cm)
minimum and 3-1/2" (8.9cm) maximum from the finished wall.
For ceiling supplies only: Remove the aspirator(1), plaster
guards(2), and valve units from the yoke. Turn the yoke upside
down. Install the aspirator into the bath outlet of the yoke.
Reinstall the valve units, being sure to install the colored dot
valve on the right side. Reinstall the plaster guards.
A typical bath and shower installation is plumbed using 1/2"
N.P.T. copper tubing(12), elbows(13), and adapters(14). Use
thread sealant on all threaded connections. For bath-only or
shower-only installations, seal the unused outlet with plug(5)
provided.
IMPORTANT! Secure the bath and shower piping to support
framing.
Install temporary nipples(15) in the bath and shower elbows. Be
sure the temporary nipple used for slip-fit spout installations will
extend at least 6" (15.2cm) beyond the finished wall.
If the aspirator, plaster guards and valve units were removed for
soldering, reinstall.
Flush debris from valve and check for leaks when entire
installation is completed.
A
1010453-2-
Shut off main water supply.
Observe all local plumbing codes.
Inspect waste and supply tubing for damage. Replace if
necessary.
10" (25.4cm)
4" (10.2cm)
BATH/SHOWER
INSTALLATION
4
1
Bath
Outlet
Yoke
5
5
2
72"(182.9cm) –
78" (198.1cm)
TO FLOOR
(TYPICAL)
48" (122cm)
TO FLOOR
SHOWER
INSTALLATION
Finished Wall
11
2" Min. (5cm)
3-1/2" Max. (8.9cm)
2
D-shape Up
D-shape Down
15
13
12
14
14
12
13
15
Kohler Co., Kohler, WI, U.S.A.
loading

Este manual también es adecuado para:

Coralais k-15801mCoralais k-15802Coralais k-15802mCoralais k-15803Coralais k-15803m