V-ZUG Solo Instrucciones De Instalación página 23

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
(adjustable height of the overall hood height
630-830mm / 800-950mm). The upper tower
is provided with a drilling stencil with which
you see the exact position of the hole (remove
drilling stencil after drilling).Please drill three
attachment holes with a hole diameter of
6mm.Now please attach the exhaust hose
(with the exception of recirculation hoods) and
the electrical connection in such a manner
that connecting the hood will be simple later
on. Please ensure that only as much of the
exhaust hose is protruding from the upper
hose shaft as will be required for further
installation.
The side of the upper tower will now be
attached to the wall flange using the hexago-
nal screws provided (M5). Attach the hose to
the hood posts, create an electrical
connection to the power supply and please
allow the low voltage wiring to the light diodes
to protrude from the upper tower for later
connection. The electrical connection to the
hood must be made for external blowers. Now
place the hood module in the upper part and
attach it with the hexagonal screws (M5)
through the previously drilled attachment
holes. Now place the under tower on the
installed upper tower and fasten it
provisionally with tape.Now place the glass
plate on the hood module, lead the glass
holder through the hole in the pane and attach
it with the help of the previously loosened
screws (shift lever must be pointing forward)
tightly to the hood module. Now create the
connection between the lamp and the controls
via the connector coupling, as well as the
connection between switch and controls. Now
please insert the low voltage wiring for the
light diodes in the upper tower into the
controls. First hang the safety chain between
the glass holder and grease filter. Then please
install the grease filter by turning it clockwise
en
Tabla de contenido
loading

Tabla de contenido