2. OUTDOOR UNIT INSTALLATION
2-1. INSTALLING THE UNIT
earthquake or a gust.
• Do not use the drain socket and the drain cap in the cold region.
2-2. CONNECTING WIRES FOR OUTDOOR UNIT
to the connecting section of the terminal block.
with the cable clamps.
TION is completed.
wire with cable clamps.
Connecting order
• Connect the terminal block in order,
from the A, B and C unit side.
Terminal
block
UNIT
UNIT
• For future servicing, give extra length to the connecting wires.
-
-
Terminal block for
Terminal
Terminal
block
block
UNIT
UNIT
UNIT
UNIT
Make the setting
depth deeper.
Anchor leg
Anchor both length
Cable clamp
<OUTDOOR UNIT>
Terminal
Terminal
Terminal block for
block
block
UNIT
POWER SUPPLY
UNIT
UNIT
<INDOOR UNIT>
Fix here with
Make with wider.
Anchor both pitch
Terminal block
Service panel
15 mm
35 mm
Lead wire
5