Selecta RE-650 Manual Instrucciones página 48

Reactor para planta piloto
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

2.2.10   Discharge valve installation 
Note: Make sure that the discharge valve is open before installation, in case of damage of the reactor body. 
Please refer to Figure 2.2.10. 
Fit upper part of the flange (59) and a lid gasket (60) to the glass drain port (9) and the lower part of the flange and gasket 
to the discharge valve (14). Put sealing ring (61) between the upper and lower flange, keep them in the right position and 
tighten the butterfly nut.
2.2.11  
Vacuum gauge and control box installation 
Please see chapter 1.4 to find the installation position of Vacuum gauge (4) and control box (17).
2.2.12  
Vessel jacket circulating pipe kit installation 
The lower connecting joint of the vessel jacket is inlet, the upper is outlet. Please refer to figure 2.2.10.2 to install it. 
 
                                           
48
Figure 2.2.10 RE‐650 discharge valve installation 
 
 
 
 
 
Figure   
2.2.12   
9      Reactor Vessel 
14    Discharge valve 
59    Flange 
60    Lid gasket 
61    Sealing ring 
 
       
62    Connector 
63    Ball valve 
64    Three‐way adapter 
65    Hose bracket 
66    Flat washer 
67    Stainless steel hose 
68    Connection elbow 
Circulating pipe kit installation 
Tabla de contenido
loading

Este manual también es adecuado para:

1001840

Tabla de contenido